CTRE is an Iowa State University center, administered by the Institute for Transportation.

Address: 2711 S. Loop Drive, Suite 4700, Ames, IA 50010-8664

Phone: 515-294-8103
FAX: 515-294-0467

Website: www.ctre.iastate.edu/

Iowa State University--Becoming the Best

Utility Cut Repair Techniques to Reduce Settlement in Repaired Areas, Phase 2 (TR-566)

Researcher(s)

Principal investigator:

Co-principal investigators:

Project status

Completed

Start date: 12/01/06
End date: 05/31/09

Publications

Report: Utility Cut Repair Techniques to Reduce Settlement in Repaired Areas, Phase 2 (TR-566) (22.46 mb pdf) June 2012

Tech transfer summary: Utility Cut Repair Techniques to Reduce Settlement in Repaired Areas, Phase 2 (1.08 mb pdf) Jun 2012

Sponsor(s)/partner(s)

Sponsor(s): Iowa Department of Transportation

About the research

Abstract:

Based on the results of Phase I, the research team recommended monitoring the constructed utility cuts for two more years, constructing new trenches using the three methods suggested by the research team during Phase I, and instrumenting utility trenches to further understand the mechanisms of trench backfill settlement and load distribution. This project aims to improve utility cut construction practices by continued monitoring of restored cuts and improving the understanding of trench settlement and load transfer through the instrumentation of utility trenches, with the goal of increasing the pavement patch life and reducing the maintenance of the repaired areas.