CTRE / Jul 30, 2018
Hubbell Ave, Part 2
Updated and modified the results of a previous analysis. The project extent was adjusted to Hubbell Ave from Easton Blvd to E 33rd St, and 2011 data were added. Deliverables: 13 intersection collision diagrams, six summary tables (summarized by intersection/mainline section), and stacked crash severity diagram.