Iowa State University
Institute for Transportation
Menu
Toggle
Search
Toggle
Search CTRE
About
About CTRE
People
Focus Areas
Programs
Iowa Pavement Management Program (IPMP)
Iowa Traffic Safety Data Service (ITSDS)
Sustainable Transportation Systems Program (STSP)
Research
Completed
In-Progress
Publications
Resources
REACTOR Lab
SHRP 2 – Roadway Information Database
Traffic and Safety Informational Series
News
Events
Contact
CTRE
Center for Transportation Research and Education
CTRE
|
People
Travis Hosteng
About Travis
Research
Completed Research
Jul, 2022
Evaluation of the Use of Link Slabs in Bridge Projects
Jun, 2020
Long-Term Performance Evaluation of Timber Bridges
Jan, 2020
Evaluation of the Performance of A1010 Bridge Steel
Jul, 2019
Development of a Smart Timber Bridge–Phase III: Moisture and Strain Sensor Investigation for Historic Covered Bridges
Feb, 2019
Laboratory and Field Evaluation of a Composite Glued-Laminated Girder to Deck Connection
Jan, 2019
Integral Abutment Details for ABC Projects, Phase II
Sep, 2018
Cost-Competitive Timber Bridge Designs for Long-Term Performance
Jun, 2018
Buchanan County Smart Timber GRS Abutment Bridge
Jun, 2017
Improved Analytical Techniques for Historic Covered Bridges-Phase II
Jun, 2017
Improved Ratings for Covered Bridges through Load Testing – Phase II
Jun, 2017
Development of a Smart Timber Bridge-Phase V: Development of a Vehicle Characterization
Oct, 2016
Strength, Durability, and Application of Grouted Couplers for Integral Abutments in Accelerated Bridge Construction
Oct, 2016
Economic Impact of Multi-Span, Prestressed Concrete Girder Bridges Designed as Simple Span versus Continuous Span
May, 2016
Evaluation and Testing of a Lightweight Fine Aggregate Concrete Bridge Deck in Buchanan County, Iowa
Apr, 2016
Investigation of Techniques for Accelerating the Construction of Bridge Deck Overlays
Feb, 2016
Laboratory Investigation of Bridge Strip Seal Joint Termination Details
Aug, 2015
Laboratory Investigation of Grouted Coupler Connection Details for ABC Bridge Projects
May, 2015
Laboratory Investigation of Concrete Beam-End Treatments
Jan, 2015
Development and Integration of Advanced Timber Bridge Inspection Techniques for NBIS
Aug, 2013
Pilot Project – Demonstration of Capabilities and Benefits of Bridge Load Rating through Physical Testing
Dec, 2012
Field Evaluation of Methods to Minimize Transverse Glulam Deck Deflection Phase III
Aug, 2012
Development of a Bridge Safety Information System for the Saylorville Reservoir Bridge
Dec, 2011
Field Testing and Evaluation of a Demonstration Timber Bridge
Jun, 2010
Evaluation of the 24th Street Bridge, Interstate 80/29, Council Bluffs, Iowa
In-Progress Research
May, 2015
Investigation of Glulam Girder Bridges with Composite Prefabricated Decks
TOP