Researchers
Principal Investigator
Glenn Washer
About the research
This research is exploring risk-based inspection (RBI) approaches to bridge inspection planning to better match requirements to inspection needs through engineering analysis.
Funding Sources:
Midwest Transportation Center
University of Missouri – Columbia ($87,544.00)
USDOT/OST-R ($78,992.00)
Total: $166,536.00
Contract Number: DTRT13-G-UTC37